Our Clients

Selected Environmental Projects

OB 129 Pilot Hole Environmental Sampling and Screening.

Total E&P Nigeria Ltd. August 2013.

Post Impact Assessment of Ibewa Gas Resurgence Incidence

Total E&P Nigeria Ltd. September 2012 – Date.

Environmental Sampling and Monitoring of Air and Water Quality on OML 58.

Total E&P Nigeria Ltd. April 2012 – Date.

Environmental Evaluation Study (EER) of Enugu Airport.

Federal Airport Authority of Nigeria (FAAN). Feb 2011– 2013.

Environmental Evaluation Study (EES) of Enugu Airport.

Federal Airport Authority of Nigeria (FAAN). Feb 2011– 2013.

Air Dispersion Modelling for the Port Harcourt Office Complex

Total E&P Nigeria Ltd. July 2011 – January 2012

Northern Option Gas Pipeline (NOPL) Air Dispersion Modelling.

Total E&P Nigeria Ltd. December 2011 – 2012.

Nitrogen Dioxide Air Quality modeling

Mobil Producing Nigeria Unlimited March 2005 – May, 2005.

Reclamation of Warehouse Pit at Izombe Flowstation

Addax Petroleum Development (Nig) Ltd. June – November 2001.

Air Quality Modelling for Environmental Impact Assessment of the Bonny Terminal Redesign Project.

Macdonald Engineering, Canada; subcontractor to Shell Petroleum Development Company East. 1999-2000.

Ecological Baseline Mapping of Izombe field (OML 118)

Addax Petroleum Development (Nig) Ltd.May – July 2000.

Air Quality Modelling for the Post Impact Assessment of the Finima-Bonny Airstrip. Client: Mobil Producing Nigeria Unlimited. 1999

Site Investigation/Assessment of Obigbo North Water Injection Borrow Pit, and Otamiri Wells 1,7, & 8 Waste Pit.

Shell Petroleum Development Company of Nigeria (East.) 1998 – February, 1999.

Environmental Sensitivity Index Mapping of Alakiri Field

Shell Petroleum Development Company of Nigeria (East). August 1998 – February, 1999.

Soil and groundwater Investigation of Alakiri field

Shell Petroleum Development Company of Nigeria (East). 1998 – February, 1999.

Environmental Impact Assessment of Independent Thermal Power Plant

Mobil Producing Nigeria Unlimited, 1998.

Sand Search and Bathymetric Profiling of the Eleme River

Mobil Producing Nigeria Unlimited, .1998.

Environmental Impact Assessment of Independent Thermal Power Plant (IPP).

Mobil Producing Nigeria Unlimited, 1998.

 

Field Survey Design, QA/QC, Database Management and GIS Mapping, Report Collation and Production of the Post Impact Assessment of the Idoho 24in Pipeline oil spill of January 12 1998

Mobil Producing Nigeria Unlimited, March 1998 –September 1999.

Post Impact Assessment of the Finima-Bonny Airstrip Operations

Mobil Producing Nigeria Unlimited, December 1998-November 1999.

 

Risk analysis,Groundwater and Soil Contamination of Alakiri Field.

Shell Petroleum Development Corporation. 1998.

 

Risk analysis,Groundwater and Soil Contamination of Obigbo North and Otamiri waste pits.

Shell Petroleum Development Corporation. 1998.

 

Environmental Impact Assessment of the Abiteye Opuekeba pipeline project.

Chevron Nigeria Limited. 1992 – 1993.

 

Environmental Baseline data collection for O.M.L. 100 concession.

Elf Petroleum Nig. Ltd. 1992 – 1993.

Environmental Impact Assessment of the Inda Development Pipeline project.

Chevron Nigeria Limited. 1992.

Treatment and Restoration of Uganga and Ogariki Mud pits.

Chevron Nigeria limited. 1992.

Environmental Sensitivity Mapping of OML 58

Elf Petroleum Nig. Ltd. 1992.

Environmental Sensitivity Index Mapping of OML 57

Elf Petroleum Nig. Ltd. 1991.